BID NO. 06-195F |
|
|
|
|
CONCRETE
REVETMENT |
|
ANNUAL AWARD |
|
NOVEMBER 3, 2006 |
|
|
|
BIO-MASS TECH, INC. |
NATIONAL EROSION CONTROL, INC. |
TERRA FIRMA ENVIROMENTAL, INC. |
APOLLO CONSTRUCTION &
ENGINEERING SVS., INC. |
|
LAND O' LAKES, FL |
LAKELAND, FL |
BROOKSVILLE,FL |
SUN CITY CENTER, FL |
|
ITEM 1. |
|
3"
UNIFORM SECTION STYLE FABRIC INSTALLED |
|
COST PER SQUARE FOOT |
$5.48 |
$3.57 |
$3.99 |
$12.28 |
ITEM 2. |
|
4"UNIFORM
SECTION STYLE FABRIC INSTALLED |
|
COST PER SQUARE FOOT |
$6.35 |
$3.95 |
$5.35 |
$14.60 |
ITEM 3. |
|
6"
UNIFORM SECTION STYLE FABRIC INSTALLED |
|
COST PER SQUARE FOOT |
$8.89 |
$5.88 |
$6.15 |
$19.23 |
ITEM 4. |
|
FILTER FABRIC INSTALLED |
|
COST PER SQUARE FOOT |
$0.75 |
$0.07 |
$0.15 |
$1.93 |
ITEM 5. |
|
5" FILTER POINT MAT INSTALLED |
|
COST PER SQUARE FOOT |
$5.48 |
$3.39 |
$3.85 |
$16.93 |
ITEM 6. |
|
8" FILTER POINT MAT INSTALLED |
|
COST PER SQUARE FOOT |
$6.35 |
$3.89 |
$5.20 |
$23.85 |
ITEM 7. |
|
10" FILTER POINT MAT INSTALLED |
|
COST PER SQUARE FOOT |
$8.89 |
$5.88 |
$6.05 |
$27.69 |
|
|
MATERIAL WARRANTY |
N/A |
1 YEAR |
1 YEAR |
1 YEAR |
LABOR WARRANTY |
12 MONTHS |
1 YEAR |
1 YEAR |
1 YEAR |
INSTALLATION STARTED |
5 DAYS |
3 DAYS |
5 DAYS |
30 DAYS |
|
|
|
|
|
|
|